|
GSM cellular base station – enhancing remote telecommunications in Chile
|
|
|
|
| |

|
Technical data
| Installation area: |
Mountainous remote, 46m² |
| Power rating: |
5.4kWp |
| Installation location: |
San Fabian, Chile |
| Year of installation: |
2004 |
| Number/ type of modules: |
72 Shell SP75 modules, mono-crystalline |
| Installation/ type of installation: |
Ground installation, hybrid PV-Diesel |
| Tilt angle: |
45°, facing north |
| Load: |
1135 Ah/day |
| Charge controller: |
3x145A, 48V |
| Battery bank capacity: |
3600 Ah (at 48V nominal) |
| Diesel generator usage: |
600 hours per year (rated at 12.5kW) |
|
|
Penny’s Bay – boosting the hi-tech image of the second Disneyland in Asia
|
|
|
|
| |

|
Technical data
| Installation area: |
Roof top, 830m² |
| Power rating: |
87kWp |
| Installation location: |
Hong Kong |
| Year of installation: |
2004 |
| Number/ type of modules: |
Glass/glass laminate 87kWp, mono-crystalline |
| Inverter: |
Zone 1 – 10.5kVA grid-connected Zone 2 to 5 – 2x50kVA grid-connected, 1x20kVA stand- alone inverters |
| Installation/ type of installation: |
Roof integrated PV, grid-connected |
| Tilt angle: |
22°, facing south |
| Building use: |
Fire station, Ambulance and Police station |
| Implementation period: |
3 months |
|
|
Tesco Lotus – Thailand’s leading supermarket chain
|
|
|
|
| |

|
Technical data
| Installation area: |
Aluminium flat roof, 7,376m² |
| Power rating: |
461kWp |
| Installation location: |
Bangkok, Thailand |
| Year of installation: |
2004 |
| Number/ type of modules: |
2,880 Shell PowerMax® Plus 160 modules, 160Wp, frameless, mono-crystalline |
| Inverter: |
3 X 150kVA Master-Slave |
| Installation/ type of installation: |
Roof mounted, grid-connected |
| Tilt angle: |
1135 Ah/day |
| Building use: |
Hypermarket |
|
|
Village electrification – providing electricity to 1,300 remote homes for the first time
|
|
|
|
| |

|
Technical data
| Installation area: |
Remote villages |
| Power rating: |
205kWp (total for 26 villages) |
| Installation location: |
Yunnan and Xinjiang, China |
| Year of installation: |
2004 to 2005 |
| Number/ type of modules: |
2,732 Shell S75 modules, multi-crystalline |
| Inverter: |
4.5kVA main + 3kVA string inverters |
| Installation/ type of installation: |
Ground installation, centralised village electrification |
|
|